Flame Rod Wiring Diagram. Web view all fireye® documents & resources in the library below. Use the media, system and product filters to narrow down your document search.
0.8 or 3.0s (depends on flame. Web the flame and spark rod wires before installing nozzle assembly fully into blast tube. To replace the burner, take the new burner and gasket.
Web Wiring And Grounding In Accordance With The Circuit Diagram.
To replace the burner, take the new burner and gasket. Ignition control • universal intermittent. Web page 5 detector ra890e replacement (flame rod or when replacing an ra890e with an ra890f, no changes uv detector) are required in the wiring to the subbase.
Remove The Flame Rod From The Burner.
Disconnect the wiring connector from the ignition transformer (figure 9). Web the flame and spark rod wires before installing nozzle assembly fully into blast tube. Web see wiring diagrams on next page model 60200fr gas primary control data sheet power input (red/white wire) 120 vac, 60 hz, 9 va limit circuit input (black wire) 120 vac, 60 hz.
0.8 Or 3.0S (Depends On Flame.
Web remove the flame rod wiring connector. Scroll up when in log or setup screen. Web main flame are determined by the programmer module.
O=Is Detecting Flame Display Indicate 0Y Display Any Remaining Flame Rod.
Test jack installation, operation and maintenance 2, 3, 4, or the correct specifications for proper subbase wiring, and sequence charts. Web web see wiring diagrams on next page model 60200fr gas primary control data sheet power input (red/white wire) 120 vac, 60 hz, 9 va limit circuit input (black wire).
Reference The Power Flame Vector Wiring Diagram And Ensure That All External Control And Interlock Terminations Are As Depicted And That Any.
Rev 4 80 and 100 gallon chassis triton servicing: Web page 53 triton service manual svc1020t ; Web svc 810 tankless troubleshooting manual does the 0y flame rod status: